Roll-on/roll-off
by module transporter/low-bed trailer
Unless the cargo is permitted
by land transportation, the cargo can be forwarded to the nearest port,
via either roll-on/off operation or lift-on/off through coastal shipping,
so as to on-forward the cargo from the first port to the final loading
/discharging port, where the mother vessel is berthed, with the cargo
loaded on module transporter or low-bed trailer, according to dimension
of the project cargo and pier's stevedoring equipment status as well.
This operation applies to inbound as well as outbound project shipment
from the very origin to the final destination jobsite.
While expertise of Toplas deserves being proud of our remarkable experience
on turn-key base, worry- free to the construction jobsite. Toplas monitors
the progress and status of the every moment with well-organized coordination
of all switching point together with compiled extensive knowledge at the
port and road survey for critical point for smooth forwarding to the final
jobsite. Safety and economical logistics costs is the core Toplas pursues.
Lift-on/Lift-off
operation by floating crane/shore crane
Untitled Document
Toplas World Logistics, Inc
Room 402, Kyuchun Bldg, 629-11 Sihnsa-dong, Gangnam-Gu, Seoul, Korea ( 135-895)
Tel : 82-2-3444-2431/2/3, Fax : 82-2-3444-2434, E-Mail : toplas@toplas21.com
Copyright ¨Ï 2003 Toplas World Logistics, Inc. All rights reserved.