The project
cargo is generally defined as the heavylift/overdimensional cargo ranging
from over 44 tons/unit in weight and over 25 meters in length and over
4.5 meters in height and over 3.5 meters in width, those of which are
exampled to installment/equipment to construct Power Plant, Petrochemical
plant, Overbridge/Tunnel and other similar plant and so on. The prior
approval from the relative traffic authorities for transportation is absolutely
needed.
The project-characterized consignments from overseas to Korean major ports
I.e. Masan, Ulsan, Busan, Kwangyang, Mokpo, Kunsan, Pyungtaeck, Incheon,
Yeosu, are being taken special care of by Toplas families as below-stated.
Roll-on/roll-ff operation by module transporter/low-bed trailer
Lift-on/Lift-off operation by floating crane/shore crane
Mobilization of flat (deck) barge/tug-boat/stevedore equipment
Sea-fastening of heavy/lengthy cargo on deck
barge
(Pedestals.trestle beams.supporter and lashing/shoring materials)
Mobilization of erection equipment at the construction place
Traffic route survey from port to jobsite and vice-versa
Precise investigation for modification/reinforcement of traffic obstacles, if any.
Turn-key based operation for plant moving to overseas.
Administrative procedures such as tranport permits with police escorts
Toplas guarantees you with professional solutions
in turn-key basis along with booking of ocean-going vessel and on-time
mobilization of tug-barge for lengthy and heavylift cargoes here in Korean
logistics market.
Untitled Document
Toplas World Logistics, Inc
Room 402, Kyuchun Bldg, 629-11 Sihnsa-dong, Gangnam-Gu, Seoul, Korea ( 135-895)
Tel : 82-2-3444-2431/2/3, Fax : 82-2-3444-2434, E-Mail : toplas@toplas21.com
Copyright ¨Ï 2003 Toplas World Logistics, Inc. All rights reserved.